Buckner Lane Widening Project

Buckner Lane Widening Oct 27 Meeting graphic

The City of Spring Hill held a virtual Public Meeting for the Buckner Lane widening project on Tuesday, October 27, 2020 at 6:00pm and 7:00pm. The purpose of the meeting was to view the latest plan documentation for the North Segment of the Buckner Lane widening project along with an update on the project milestone schedule and future public meetings. Citizens were encouraged to attend and participate in the meeting that included a brief question and answer period following the briefing presentation. The first (6 pm) meeting can be viewed HERE and the second meeting (7 pm) can be viewed HERE

BUCKNER LANE WIDENING PROJECT – VIRTUAL PUBLIC MEETING NOTICE 

DECEMBER 8, 2020 AT 6:00PM and 7:00PM

 

The City of Spring Hill will conduct a virtual Public Meeting for the Buckner Lane widening project on Tuesday, December 8, 2020 at 6:00pm for property owners in Tracts 49, 53, 55-67, and 70 (Group A) and 7:00pm for property owners in Tracts 68, 69, 71-81, 84 and 85 (Group B).  The purpose of the meeting will be to view the latest right-of-way and easement plan documentation for the North Segment of the Buckner Lane widening project along with more detailed information on the right-of-way and easement acquisition process.  Affected property owners located in the North Segment are encouraged to attend and participate in the meeting that will include a brief question and answer period following the briefing presentation.  The virtual public meeting can be accessed using the following link: https://bit.ly/BucknerLnDec20.  Additional information regarding the virtual public meetings and a map detailing Tract numbers will be posted on the City’s project website using the following link: springhilltn.org/bucknerlanewp.  

Property Owners Meeting Exhibit

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9
  10. 10
  11. 11
  12. 12
  13. 13
  14. 14
  15. 15
  16. 16
  17. 17
  18. 18
  19. 19
  20. 20
  21. 21
  22. 22
  23. 23
  24. 24
  25. 25
  26. 26
  27. 27
  28. 28
  29. 29
  30. 30
  31. 31

Seeking Citizen Input on Completed Conceptual Plans

Preliminary design for the Buckner Lane Widening Project continues to progress following the second public meeting held on July 9, 2020. The proposed widening is from Duplex Road north to Buckner Road. The City’s consultant, Kimley-Horn, as well as City officials have been working to complete preliminary design plans for the alignment and configuration of the widening project.The minimizing of impacts to property owners along the corridor remains a key design objective as design progresses.The conceptual plan will serve in part as the basis for preparing preliminary plans, right-of-way plans, and final construction plans for both the north and south segments.Key design features include:  

  • Two lanes in either direction along with center turn lanes and decelerations at various intersections along the corridor. 
  • Medians are proposed as a traffic calming measure and to manage turn movements as well as to improve aesthetics along the corridor. 
  • A sidewalk and multi-use trail are proposed on either side of the street along with corresponded pedestrian crossings at signaled intersections to enhance walkability and safe pedestrian travel along the corridor.  

While the City is not able to facilitate a face-to-face public meeting due to COVID-19 restrictions and guidelines, the City is providing presentation materials that include design details and aerial plan imagery depicting the conceptual alignment of the widening project along the entire corridor from Duplex Road to Buckner Road for viewing by the public as well as the latest project schedule.

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9
  10. 10
  11. 11
  12. 12
  13. 13
  14. 14
  15. 15
  16. 16
  17. 17
  18. 18
  19. 19
  20. 20
  21. 21
  22. 22
  23. 23
  24. 24
  25. 25
  26. 26
  27. 27
  28. 28
  29. 29
  30. 30
  31. 31
  32. 32
  33. 33
  34. 34
  35. 35